Chris and crew have been working all winter to rehab the gift car. They have stripped it down to the beams, installed new metal and cement floor, put up new walls, created a storage room, are installing new FRA glazed windows, fixed the water leaks, and done body work on the outside of the car. The goal is to have it ready for the upcoming Easter Bunny train rides. New custom cabinetry was ordered and installed. The new design has created more floor space in the car, and added approx 5 inches to the hallway. Jon Andreason has completely rewired the car, and Gary Mathews has stripped out all the extra unnecessary parts (old transformer, piping etc)
Carpet has been ordered. After this is all done, it is scheduled to receive a new exterior paint job. Stay tuned for updates and pictures!